Two Bed Room House Plan With Costing

  • 3 Comments
  • September 14, 2016
  • by
  • oriyo victor

Building a house has many challenges, but with proper planning with the right team, it can be fun building and seeing your house coming up stress free. We are going to look at a ready-made house plan with cost estimates for building it.

houseplan

ESTIMATION OF COSTING FOR THE TWO BEDROOM HOUSE PLAN ABOVE

ITEM DESCRIPTION   AMOUNT IN KSHS.
A STAGE ONE.  
1 SUB-STRUCTURE. From site clearance up to and including ground floor slab 450,000.00
STAGE TWO Building of the Super-structure walling. 150,000.00
C STAGE THREE.  
1 Building of ring beam,including concreting 120,000.00
D STAGE FOUR.  
1 ROOFING.Includes,wall plate,trusses,fascia board and roof cover 450,000.00
E STAGE FIVE.  
1 WINDOWS/EXTERNAL DOORS. All made of steel, including glazing. 100,000.00
2 INTERNAL DOOR FRAMES. Sizes 6×2 and 4×2.Include fixing to the wall 20,000.00
3 ELECTRICAL, PLUMBING AND DRAINAGE PIPING. These are waste pipes,  
  Plumbing pipes, electrical piping and switch boxes. 30,000.00
F STAGE SIX.  
1 PLASTER. This covers, internal wall, floor screed, external plaster above  
  ring beam and gable wall, plinth and pointed horizontal key. 130,000.00
G STAGE SIX  
1 CEILING BRANDERING.Including eaves 60,000.00
2 INTERNAL DOORS. All semi-solid flush door, with brass hinges and union locks 65,000.00
3 WINDOW BOARDS. Mahogany 6 inch by 1 inch 10,000.00
4 ELECTRICAL WIRING. 25,000.00
H STAGE SEVEN  
1 TILING.Saj Ceramic floor entire house and wall tiling in washroom and kitchen 180,000.00 
2 KITCHEN CABINETS AND WARDROBES carpentry fit outs. 150,000.00
3 CURTAIN RODS 40,000.00
I STAGE EIGHT  
1 PLUMBING AND ELECTRICAL FITTINGS, sanitary wares,electrical lights  
  Sockets, switches. 60,000.00
J STAGE NINE  
1 CEILING BOARD. 9mm Chipboard from timsales and gypsum cornice. 57,000.00
2 PAINTING. One emulsion undercoat and 2 final silk coat to internal room  
  Gloss paint to windows, clear vanish to window board, internal doors  
  architraves,quadrants.External one emulsion coat and two mart coats 80,000.00
  TOTAL COST OF CONSTRUCTION TO COMPLETION 2,227,000.00

The estimation and costing of the house Plan has been based on the specifications below.

  • The house is built on a murrum soil, with a strip foundation depth of 1200mm, 600mm wide; thickness of concrete footing is 150mm. Strip foundation concrete of ratio 1:2:4, with 8mm high yield steel (y 8).
  • 9 inch uncut stones for foundation walling, with a mortar ratio of 1:3.
  • Hardcore filling 300mm thick, murrum blinding and treated with gladiator pesticides.
  • Drainage and electrical pipes are placed in concrete.
  • The ground floor slab is 100mm thick, reinforced with A 65 BRC mesh, on 1000g polythene sheet dump prove membrane.
  • 9 inch by 6 inch machine cut stones for super-structure walling.
  • 300mm by 150mm ring beam, with 10mm and 8mm high steel bars, 1:2:4 concrete ratio mix.
  • Roof cover  galvanized colored  iron sheet  of 30g,with cypress timber truss members  of size 100mm by 50mm (4inch by2inch).Wall plate of same size also, timber purling of size 75mmby50mm    (3inch by 2inch).
  • External windows and door will be steel cased. French window design, with 4mm clear glass, except washroom 3mm thick translucent glass.
  • Use of cypress timber in all carpentry work, except wardrobes and kitchen cabinets.
  • Use ppr pipes for plumbing and heavy gauge PVC pipes for drainage system.
  • Use heavy gauge PVC conduits for electrical piping, electrical cables from authorized dealers like East African cables.
  • Internal plaster on all walls, cement/lime sand mix, and 25mm floor screed cement/sand mix. External finish, pointed key below ring beam, and plaster render above ring beam, walling below and above bay windows and entrance walling and Plinth plaster
READ MORE
  • Design
  •  
  • house
  •  
  • Layout Plan
  • Architecture
  •  
  • Planning

Search

Archives

  • June 2017
  • March 2017
  • January 2017
  • December 2016
  • January 2016
  • December 2015
  • June 2015
  • May 2015
  • February 2015
  • November 2014
  • October 2014
  • May 2014
  • April 2014
  • March 2014
  • February 2014
  • November 2013
  • October 2013
  • August 2013
  • July 2013
  • March 2013
  • February 2013
  • January 2013
  • November 2012
  • October 2012
  • September 2012
  • July 2012

Recent Posts

  • 3 BEDROOM STARTER HOME
  • Factors to look at when investing in real estate: location and potential returns
  • A perfect 3 Bedroom House plan for Kshs.12,000.
  • Building your home at a fraction of the cost
  • The ABC of taking out a Mortgage

Calendar

January 2013
S M T W T F S
 12345
6789101112
13141516171819
20212223242526
2728293031  
« Nov   Feb »

Categories

  • Apartments
  • Architecture
  • Construction
  • Contracts
  • Design
  • Land
  • News
  • Planning
  • renovations
  • Walls

Tags

building a house Building Foundation Buying ceramic floor tiles. buying property off plan Cabinets ceramic tiles construction contracts Design Drainage floor Green House house Hydraform Interlocking Blocks interior Kitchen Land Laundry Room Layout Plan Paint Planning Plumbing Plumbing and Drainage Pre Cast Concrete Real Estate Safe House Security Starter home Survey.Building. wall Windows

Calendar

January 2013
S M T W T F S
 12345
6789101112
13141516171819
20212223242526
2728293031  
« Nov   Feb »

Categories

  • Apartments
  • Architecture
  • Construction
  • Contracts
  • Design
  • Land
  • News
  • Planning
  • renovations
  • Walls

Pages

  • Contact
  • Favourite Properties
  • Free ebook:Step by Step Guide to Build Your House.
  • Glossary
  • Home
    • About Us
    • Our Services
    • Step by step to build a house
  • Membership Confirmation
  • Memberships
  • My Properties
  • Profile
  • Properties Search Results
  • Property Listing
  • Property Sales/Rentals
  • Property Search
  • Right Sidebar
  • Sitemap
  • Submit Property

Archives

  • June 2017
  • March 2017
  • January 2017
  • December 2016
  • January 2016
  • December 2015
  • June 2015
  • May 2015
  • February 2015
  • November 2014
  • October 2014
  • May 2014
  • April 2014
  • March 2014
  • February 2014
  • November 2013
  • October 2013
  • August 2013
  • July 2013
  • March 2013
  • February 2013
  • January 2013
  • November 2012
  • October 2012
  • September 2012
  • July 2012
© 2021Ujenzi Today | Proudly powered by WordPress | Theme by Theme Farmer.