Skip to content

Ujenzi Today

  • Home
  • Profile
  • Our Services
  • Our Properties
    • Property Listing
    • Favourite Properties
  • Property Sales/Rentals
  • About Us

3 BEDROOM STARTER HOME

  • 0 comment
  • June 29, 2017
  • by
  • oriyo victor

 

3Bedroom starter Home

COST: KSHS- 2,640,000/= with EPS 2,300,000/= with Stone.

CONSTRUCTION PERIOD: 45 DAYS with EPS, & 90 DAYS with Stones

FEATURES:

-Gross Built Up Area- 76 Square Meters

-3 Bedrooms. All Bedrooms Share one Bathroom

-Kitchenette and Lounge

-Cost is inclusive of cost of house designs.

Click here> Floor Plan for the House

SPECIFICATIONS:

The cost is based on the following finish specifications:-

WALLING FINISHES

Internally: – skimmed walls with three coats of first quality matt finish and gloss to doors and windows.
Externally:- skimmed walls with three coats of first quality gloss finish for paneled walls and keyed wall surfaces with a 900mm skirting, plastered and painted with a gloss finish for the masonry walling.
Ceiling finish:-P.V.C ceiling based on the client’s taste of colors
Roofing:
Gauge 30, IT5 sheets on 4×2 trusses and 250x25mm painted fascia board.

Doors:
Solid T-door (cypress) with a 3lever lock for the external doors and veneered semi solid flush doors with 2 lever locks internally.

Windows:
Standard casement windows with 3mm c.s.g and 4mm o.b.s for the wash rooms

Floor and walls:
300×300 x8mm ceramic tiles to floors and 200x250x6mm ceramic tiles to walls.

PLUMBING

Water closet and wash hand basin to be “white India” in make, and single bowl double drainer sink for kitchen.

ELECTRICAL FINISHES

Bedrooms: Ceiling rose (one per room)
Lounge: 4 ft fluorescent ceiling fitting and two wall brackets
Kitchen: 4ft. fluorescent fitting (one per each)
Corridor: 4 ft. fluorescent fitting.
Twin socket outlets( one per bed room, two for the lounge and two for the kitchen)
Security lighting: two security lights (back and front)
EXCLUSIONS

Rain water goods (gutters) are not included in our quotes
Sewage disposal not incorporated
All external/civil works not incorporated.

Source

www.fediltyhousing.co.ke

READ MORE
  • Starter home
  • Architecture
  •  
  • Planning

Search

Archives

  • June 2017
  • March 2017
  • January 2017
  • December 2016
  • January 2016
  • December 2015
  • June 2015
  • May 2015
  • February 2015
  • November 2014
  • October 2014
  • May 2014
  • April 2014
  • March 2014
  • February 2014
  • November 2013
  • October 2013
  • August 2013
  • July 2013
  • March 2013
  • February 2013
  • January 2013
  • November 2012
  • October 2012
  • September 2012
  • July 2012

Recent Posts

  • 3 BEDROOM STARTER HOME
  • Factors to look at when investing in real estate: location and potential returns
  • A perfect 3 Bedroom House plan for Kshs.12,000.
  • Building your home at a fraction of the cost
  • The ABC of taking out a Mortgage

Calendar

June 2017
S M T W T F S
 123
45678910
11121314151617
18192021222324
252627282930  
« Mar    

Categories

  • Apartments
  • Architecture
  • Construction
  • Contracts
  • Design
  • Land
  • News
  • Planning
  • renovations
  • Walls

Tags

building a house Building Foundation Buying ceramic floor tiles. buying property off plan Cabinets ceramic tiles construction contracts Design Drainage floor Green House house Hydraform Interlocking Blocks interior Kitchen Land Laundry Room Layout Plan Paint Planning Plumbing Plumbing and Drainage Pre Cast Concrete Real Estate Safe House Security Starter home Survey.Building. wall Windows

Calendar

June 2017
S M T W T F S
 123
45678910
11121314151617
18192021222324
252627282930  
« Mar    

Categories

  • Apartments
  • Architecture
  • Construction
  • Contracts
  • Design
  • Land
  • News
  • Planning
  • renovations
  • Walls

Pages

  • Contact
  • Favourite Properties
  • Free ebook:Step by Step Guide to Build Your House.
  • Glossary
  • Home
    • About Us
    • Our Services
    • Step by step to build a house
  • Membership Confirmation
  • Memberships
  • My Properties
  • Profile
  • Properties Search Results
  • Property Listing
  • Property Sales/Rentals
  • Property Search
  • Right Sidebar
  • Sitemap
  • Submit Property

Archives

  • June 2017
  • March 2017
  • January 2017
  • December 2016
  • January 2016
  • December 2015
  • June 2015
  • May 2015
  • February 2015
  • November 2014
  • October 2014
  • May 2014
  • April 2014
  • March 2014
  • February 2014
  • November 2013
  • October 2013
  • August 2013
  • July 2013
  • March 2013
  • February 2013
  • January 2013
  • November 2012
  • October 2012
  • September 2012
  • July 2012
© 2021Ujenzi Today | Proudly powered by WordPress | Theme by Theme Farmer.